Pinnacle Valley
Client
Accor Group
Completed
January 2020
Location
Merrijig
Value
$200K
Architect
-
The Sebel Pinnacle Valley Resort in Merrijig, Victoria, is a premium four-star accommodation destination located in the Victorian High Country, servicing both tourism and corporate markets year-round. The facility includes self-contained apartments, conference spaces, and leisure amenities, requiring reliable and efficient energy infrastructure to support continuous operation across a high-demand hospitality environment.
EDSA Group was engaged to deliver a renewable energy solution for the site, completing the design and installation of a 100kW solar PV system. The system incorporates high-performance Fronius inverters, selected for their reliability, monitoring capability, and suitability for commercial applications. The installation required integration with the existing electrical infrastructure of an operational resort, with works carefully staged to minimise disruption while ensuring full compliance with Australian Standards and network authority requirements.
Delivered within a live environment, the project demonstrates EDSA Group’s capability in commercial solar installations across regional Victoria. The 100kW solar system provides a sustainable energy solution, reducing grid dependency and supporting long-term operational cost savings, while aligning with the resort’s broader sustainability objectives.